Loading & Unloading workstation �� Use Cases

Loading & Unloading Use Cases

The following scenarios are used for preliminary screening, and the final configuration needs to be confirmed based on the workpiece, machine tool, cycle time, shift system, and on-site safety conditions.

Typical Scenarios

Multi-System Machine Mixed-Line Scenario
Scenario 01: Mixed Line with Multiple System Machines

Multiple CNC systems from different brands exist on the same line and require unified control logic.

Mixed Line Renovation and Unified Control

Suitable for parallel scenarios of systems such as Fanuc, Mitsubishi, and Siemens, and connect devices according to unified control logic.

FanucMitsubishiSiemens1V2
Small Batch, Flexible Switching Scenario
Scenario 02: Small Batch, Multiple Varieties

If product models are frequently switched in the same shift, the model change steps and parameters need to be checked.

Flexible Line and Template Changeover

Record the changeover steps and line stop time through standard action templates and parameter switching.

Block PartsBar StockLathe1V1
Night shift staffing and abnormal interlocking scenarios
Scenario 03: Night shift staffing

The night shift staffing is limited, and continuous operating conditions and manual takeover methods need to be checked.

Night shift production and abnormality interlocking

Records abnormalities through early warning and interlocking to assist in arranging night shift personnel and manual takeover.

Night ShiftWarningMachining Center1V2
Complex Incoming Material Orientation & Vision Picking Scenario
Scenario 04: Complex Material Orientation

Manual pre-positioning is time-consuming, and incoming material orientation is highly variable.

3D Vision for Vision-Guided Bin Picking

Handle posture recognition and positioning before loading through visual recognition and path planning.

3D VisionVision-Guided Bin PickingMilling MachineSeventh Axis
Quality Risk Sensitivity & Process Inspection Scenario
Scenario 05: Quality Risk Sensitivity

Sensitive to broken tools, dimensional deviations, and batch defect risks.

Broken Tool and Defect Detection

Record problem discovery and response time through process detection and exception warning.

Broken Tool DetectionDefect DetectionGrinding Machine1V1
Data Collaboration Upgrade & MES Integration Scenario
Scenario 06: Data Collaboration Upgrade

Want to connect work orders, reporting, traceability, and logistics systems.

MES/AGV Data Collaboration

Access work orders, work reports, traceability and logistics data by project, and clarify the data interface of the workstation.

MESAGVKanban1V3

Business Discussion

Submit the type of workpiece, machine model, and target cycle, and we will provide suitable machine and layout recommendations.

Schedule an On-site Assessment